A mobile industrial CT system that has to be driven to a pipeline's right of way and set up in a field tent has a different set of constraints from a fixed installation, and the 320 kV supply at its center is where those constraints concentrate. The supply must produce a stable kilovolt for an X-ray tube that draws a few milliamps, survive being transported over rough ground, run from a generator whose frequency wanders, and fit into a cabinet that a two-person crew can lift. Each of those constraints removes an option that a laboratory design would use.

The first consequence of mobility is that the oil-filled tank has to be sealed against transport loads. A tank that is designed for a fixed floor can rely on the oil's expansion being absorbed by a conservator; a mobile tank has to be fully sealed with a bellows or a bladder, because the oil will slosh during transport and any air pocket that forms at the top of the tank will reduce insulation margins. Bellows-based expansion vessels are the usual choice, and their fatigue life under repeated transport cycles is a real design parameter rather than a detail.
The second is shock and vibration. The cabinet travels in a truck or on a trailer, and the road's spectrum is worst in the range of a few hertz to a few tens of hertz. A supply whose transformer is bolted rigidly to the tank's base will transfer that spectrum into the transformer's core clamping bolts, and those bolts will loosen over months. Thread-locking compounds and a torque specification with a re-check interval are the practical answers; elastomeric mounts are worse in this application because they allow relative motion between the tank and the cabinet's frame, which stresses the high-voltage connections.
The third is the generator's power quality. Field generators are often diesel units whose frequency sagged by a few percent when the tube's load steps, and whose voltage distortion includes a healthy fifth and seventh harmonic. The supply's input stage must tolerate that without the output moving, and the output moving is exactly what happens when the input filter's bulk capacitor is sized for a laboratory's clean supply. The visible symptom is a kV that dips each time the tube's current steps up, which shows up in the reconstructed image as a ring artifact.
The fourth is thermal management in an enclosure that cannot be opened for ventilation. Mobile systems are often sealed to keep out dust and rain, so the supply's heat has to go somewhere, and the only reliable path is the oil-to-air exchanger with a fan that is itself a reliability item. A fan failure in a sealed cabinet leads to an over-temperature trip within an hour, and the trip is usually blamed on the supply. Redundant fans with a differential pressure sensor that reports a failed fan is a small addition that converts a trip into an alarm.
The tube's filament supply and the anode's high voltage share the tank, and the filament's isolation is a separate design problem. The filament sits at the cathode's potential, which is the full negative high voltage, so its supply has to be isolated to the full rating and has to carry the emission current through an isolation transformer that is small enough to fit near the tube's socket. The usual failure is a corona at the isolation transformer's lead exit, which appears as a slow rise in the filament current required for a fixed tube current and ends in an open circuit.
Imaging performance ties directly to the kV's stability. The attenuation of steel and of the pipeline's contents is a strong function of the photon energy, and a kV change of one percent changes the measured attenuation by several percent in the region of interest. A supply with a specified ripple of half a percent produces a beam whose spectrum shuffles at the ripple frequency, and a CT reconstruction from a few hundred views will show that shuffle as a low-contrast ring. Filtering the high voltage more heavily reduces the ripple but slows the response to a tube current step, so the trade has to be made against the acquisition's timing.
Field setup puts a premium on the supply's self-test. The crew has a limited time window and no laboratory instruments, so the supply should run a startup sequence that checks the divider's ratio against an internal reference, checks the interlocks' continuity, checks the fan's rotation, and reports the results as a single pass or a specific failure. A supply that only reports a generic fault forces the crew to guess, and guessing in the field costs hours.
The cabling between the tank and the tube is short but critical. At 320 kV, a meter of cable carries enough capacitance to store a fraction of a joule, and a discharge at the tube's socket will erode the socket's insulation. The cable's termination should be potted into the socket rather than plugged, and the socket's design should include a field-grading cone. Field crews cannot repair a potted termination, so the cable and the socket are treated as a single replaceable assembly, which is the right spares decision even though it costs more per unit.
The pipeline inspection application adds a constraint that fixed CT does not have: the tube is often run at a constant kV for hours while the system is moved along the pipe. Long constant runs expose the divider's thermal drift, and the drift appears as a slow change in the reconstructed wall thickness. A reference measurement at the start and end of each run, using a step wedge in the field of view, gives a correction that is good enough for thickness measurement even if the supply drifts. Without the reference, the drift is indistinguishable from a real thickness change.
The detector's supply is a separate low-voltage system but its timing is tied to the tube's. Most field systems use a flat panel detector whose bias is a few hundred volts, and the readout's timing must be synchronized with the tube's exposure. A supply that ramps the tube's kV slowly will overlap the exposure with the detector's readout, producing a smeared image. The synchronization should be done with hardware triggers rather than with software timing, because the field system's computer may be busy with reconstruction.
Grounding in the field is the item that most often goes wrong and is least often documented. The system's ground is the trailer's frame, and the trailer's frame is grounded through its jack pads or through a rod driven into the soil. If the soil is dry gravel, the rod's resistance can be hundreds of ohms, and the leakage current from the tube's high voltage will then raise the frame's potential. The raised potential appears as a common-mode voltage on the detector's signal and as a shock hazard for the crew. A ground resistance measurement at each setup, with a requirement to improve the ground if the reading is above a threshold, is a five-minute procedure that prevents a class of intermittent faults.
Transport validation is a test that many mobile systems skip. The supply should be run at full kV for an hour after a transport cycle that includes a rough-road segment, because the transport is what loosens connections and shifts the oil's level. A supply that passes at the factory but fails after a hundred kilometers is not a marginal supply; it is a supply whose transport tolerance was never tested. The test is inexpensive and it should be part of the acceptance procedure for any mobile system.
Spares strategy for a mobile system is driven by the repair time rather than the failure rate. The crew can replace a module but cannot repair a board, so the spares kit should include the modules whose failure stops the system, which in practice means the inverter module, the high-voltage rectifier assembly, and the control board. Carrying three modules costs a fraction of the revenue lost from a day's downtime, and the modules are small enough to fit in the truck's tool compartment.
The operator interface has to work with gloves on and in daylight. A touchscreen that is legible indoors becomes unreadable in sunlight, and a knob that is precise in a laboratory becomes impossible to turn with gloves. Physical controls with detents and a display with high contrast are the practical choice, and the kV setting should be settable in steps that correspond to the application's needs rather than in single volts.
The narrow conclusions from field experience: the oil tank's sealing and the transformer's clamping are the two mechanical items that decide whether the supply survives transport; the input stage's tolerance to generator harmonics decides whether the image has rings; and the startup self-test and the ground measurement decide whether the crew can get the system running in the time window they have.
A last item that comes up on every mobile job: the supply cabinet has to be leveled before the tube is aligned, and the leveling feet are often the feet that the transport tie-downs attach to. A cabinet tied down by its leveling feet will have those feet bent after a few trips, and a bent foot transmits the frame's load into the tank base unevenly. Separate tie-down points welded to the frame rather than to the feet keep the feet round and the tank's mounting plane flat.